Electricity was first generated in Nigeria in 1866 when two generating sets were installed to serve the Colony of Lagos. In 1951, the government of Nigeria, through an Act of Parliament, established the Electricity Commission of Nigeria (ECN) to regulate and operate the power supply systems in Nigeria. Subsequently, the Niger Dam Authority (NDA) was established for the development of the Kanji Hydroelectric Dam. In 1972, the ECN and the NDA were merged to form the Nigerian Electric Power Authority (NEPA).

The review was authored by ǼLEX  Partner Olusina Sipasi, and Associates Crystal Okwurionu and Maranatha Abraham.

You can download the full review here.